Mine closure and site visualisation
Projection Augmented Physical Landscape (PALM) technology integrates high-resolution elevation LIDAR, local knowledge, 3D-printed physical terrain, and dynamic digital projection overlays.
The aim is to bridge the gap between complex GIS datasets and intuitive human understanding. Turning high-resolution spatial data into a physical, tactile landscape makes the third dimension explicit: stakeholders can “feel” the drainage patterns of a waste rock landform and “see” the impact of infrastructure in a way 2D maps cannot.
Rio Tinto feature article: Mapping new terrain for community engagement →
Across the project lifecycle
Its core utility lies in making complex spatial and temporal landform changes explicit and tactile, with value across the whole project lifecycle:
- External stakeholder engagement: designed for Traditional Owner consultation, tactile models overcome the technical barriers of 2D GIS data, building a shared understanding of post-mining land use and the proximity of cultural sites.
- Internal project management: helping technical teams visualise mine development, closure domains and complex biophysical processes such as groundwater infiltration and surface water management.
The interactive setup projects simulated biophysical processes—including surface hydrological flows, pit lake filling, groundwater seepage pathways, and vegetation growth—directly onto 3D landscapes. Using “swappable” 3D tiles, stakeholders can visually evaluate pre-mine, operational, post-rehabilitation, and infrastructure decommissioning phases over time.
Many remote mines sit on or beside Indigenous land. Free, prior and informed consent (FPIC), set out in the UN Declaration on the Rights of Indigenous Peoples, means communities can agree to or refuse a project before it goes ahead, with a full understanding of what it involves. A licence and regulatory compliance are no longer enough.
Consent can only be informed if people genuinely understand the plans. A tactile 3D landscape shows the true scale of pits, rock dumps and tailings against familiar landmarks, and how country will look before, during and after mining, giving Traditional Owners a shared table to discuss options on their own terms.


Mining projects
The range of mining projects covers every stage of the mine lifecycle:
- Greenfield approvals and planning: environmental approvals and cultural mapping for Rio Tinto Winu, and mine development for the Azure Andover project.
- Active rehabilitation and aquifers: pit filling consultations for the BHP Mt Keith site, and spring restoration flow modelling at BHP Yandi.
- Landform design and cultural heritage: at the West Pilbara Iron Ore Project (WPIOP), operated by Onslow Iron, visualising topographic detail supports waste rock landform design and cultural heritage management.
- Infrastructure decommissioning: decommissioning built assets and visualising retained infrastructure at the Rio Tinto Gove Refinery.
- Closure and tailings consultations: surface hydrology, hydrogeological flow barriers, waste dump creep, and residue pond rehabilitation for mine closure across FMG Nullagine, Rio Tinto Channar and Eastern Range, Argyle Diamond Mine, Gove Ponds, Rum Jungle, and Ranger Mine.

